Bromford Dell Flat to Pitch Conversion

The existing bitumen membrane had reached the end of its intended life with numerous defects the building was suffering from water ingress.

Using the Datum elevate conversion system a new pitched roof was designed and installed which removed internal outlets making the building watertight with less future maintenance
required.

New insulation was introduced to the existing deck improving the buildings thermal performance and a lightweight metal tile improving the aesthetics and matching surrounding residential properties.